Global Contract For Cooling Tower Maintenance Services For Rabigh Refining & Petrochemical Company - Ongoing

  • Periodic inspection of cooling tower thermal efficiency
  • Periodic inspection of cooling tower internals and spares
  • Periodic maintenance services for cooling tower spares and components
  • Preventive maintenance for cooling tower spares and components
  • Repair and maintenance for fill system
  • Repair and maintenance for drift eliminators
  • Repair and maintenance for distribution system
  • Repair and maintenance for header line
  • Repair and maintenance for mechanical system
  • Repair and maintenance for lube system
  • Repair and maintenance for partition and wind wall
  • Repair and maintenance for louver system
  • Repair and maintenance for earthing system
  • Repair and maintenance for electrical system
  • Repair and maintenance for lighting system
  • Repair and maintenance for control system
  • Vibration analysis for fan motor
  • Rotational analysis for fan hub and leaves
  • Pitch angle analysis and rectification for mechanical draft fan leaves
  • Laser alignment of motor, gear box, fan assembly etc

Electro Mechanical Maintenance Service of all SADARA Cooling Towers (Long Term) - Ongoing

  • Periodic inspection of cooling tower thermal efficiency
  • Periodic inspection of cooling tower internals and spares
  • Periodic maintenance services for cooling tower spares and components
  • Preventive maintenance for cooling tower spares and components
  • Repair and maintenance for fill system
  • Repair and maintenance for drift eliminators
  • Repair and maintenance for distribution system
  • Repair and maintenance for header line
  • Repair and maintenance for mechanical system
  • Repair and maintenance for lube system
  • Repair and maintenance for partition and wind wall
  • Repair and maintenance for louver system
  • Repair and maintenance for earthing system
  • Repair and maintenance for electrical system
  • Repair and maintenance for lighting system
  • Repair and maintenance for control system
  • Vibration analysis for fan motor
  • Rotational analysis for fan hub and leaves
  • Pitch angle analysis and rectification for mechanical draft fan leaves
  • Laser alignment of motor, gear box, fan assembly etc

Cooling Tower Corrective Maintenance

  • Revamping Service for B&W SPIG cooling tower, 30 cells
  • Replacement of fill system
  • Replacement of Drift Eliminators
  • Replacement of nozzles
  • Revamping of distribution system

Civil Works Related to the Cooling Water

  • Civil Works for CWS, CWR Pipe lines
  • Demolition of Asphalt.
  • Removal of Base Corse.
  • Demolition of Concrete Grade Slabs.
  • Excavation.
  • Disposal of Excavated Material.
  • Dewatering, Shoring.
  • Backfill and Compaction
  • Reinstatement of Area to its original condition.

Replace, Seal, Ring : V128 Tank Plate Sealant

  • Total No’s of Tanks : 12
  • TF1-T-1001 (50Mtr Dia. In Size)
  • TF1-T-1002 (50Mtr Dia. In Size)
  • TF1-T-1101 (31 Mtr Dia. Size)
  • TF1-T-1301 (25 Mtr Dia. Size)
  • TF1-T-1302 (25 Mtr Dia. Size)
  • TF2-T-2201 (57 Mtr Dia. In Size)
  • TF2-T-2202 (57 Mtr Dia. In Size)
  • TF3-T-3101 (25 Mtr Dia. In Size)
  • TF3-T-3102 (25 Mtr Dia. In Size)
  • TF3-T-3201 (10 Mtr Dia. In Size)
  • TF3-T-3202 (10 Mtr Dia. In Size)
  • TF3-T-4501 (24.5 Mtr Dia. In Size)

Sea Water Riser

  • Forming and supply of new dish end and skirt plates
  • Forming of new semi ellipsoidal dish end for sea water riser vessel.
  • Fabrication of skirt insert plates.
  • Installation of new dish end.
  • Vessel internal and external area buffering for NDT inspection.

Pipeline Replacement during 21ABS Turnaround Maintenance for Petrokemya.

  • Site Survey, Preparation of Drawings and Quantification
  • Prefabrication and Supply of Pipe Spools prior to TAM
  • Installation of Pipeline during TAM.

Construction, Erection, Commissioning of SADARA Cooling Towers

  • Cooling Tower Erection and Commissioning at Daelim ISS Project, SADARA
  • Cooling Tower Erection and Commissioning at Daelim MFC Project, SADARA
  • Erection and Commissioning of Cooling Tower at L&T Polyethylene Project, SADARA

Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers
Construction, Erection, Commissioning of SADARA Cooling Towers

Sidem Saudi Arabia

  • Procurement, Fabrication, Grid blasting & painting and Erection of Chemical Storage Shelter, Lime Stone Storage Shelter and Central Chemical Preparation Plant(Pre- Fabricated Structure) for Marafiq.

SIDEM
SIDEM
SIDEM

Revamping Activities for CT-6 (Petro Rabigh) Cells: 04 No's


Cooling Tower Maintenance Services For FARABI Petrochemicals Company


Installation of Protection Net For CT 1, CT 2 & CT 3 PETRO RABIGH


Revamping Activities For 2 Cells Marine Cooling Tower, UO2 Package


Revamping Of CT-2 Cooling Tower At Petro Rabig

  • Revamping Of CT-2 cooling towers.

Revamping Sipchem Cooling Tower

  • Scope of Services Includes:
  • Production of Required amount of fill packs and drift eliminators.
  • Removing of existing fill packs and replacing with newly produced.
  • Servicing of Existing sprinklers, along with provision of replacement.
  • Removal and Replacement of Drift Eliminators

Turn Around Maintenance of Cooling Tower 19 ABS For Arabian Petrochemical Co. (PETROKEMYA)

  • Scope of Work Includes:
  • Cleaning of Side Sheets, and cleaning of structure.
  • Removal and Replacement of Compete Side Baffle Louvers.
  • Sludge Removal from Basin and Disposal.
  • HPWJ and cleaning of Basin Walls and Floors, Civil Repair of Basin.

Revamping Of Cooling Tower At Petro Rabig Phase I & II

  • Revamping OF CT-1, CT-2,CT-3, CT-4, CT-5, CT-6, CT-20, CT-30, CT-40 cooling towers.

Gusat Construction co.

  • Construction Steel Building for warehouse at SADARA.
  • Construction of Steel Building for Mess hall at SADARA.
  • Fabrication, supply and erection of Portable Building for SADARA.

POSCO Engineering (SIPCHEM)

  • Erection & Installation of Duct plates & Stud Bolts for SIPCHEM WCC Projects
  • Field fabrication and Erection of pipe lines
  • Construction of multistory Structural Steel Building

Inginia Polymers

  • Erection of four stage tower
  • Erection of extruders
  • Erection of polymer plant

Fluor

  • Crane Girder for Ma’aden
  • Fabricated Ducts for Ma’aden project
  • Fabrication Machining & Supply of Shafts and levers