Civil Construction of Al Khobar Seawater Reverse Osmosis Desalination : Phase II Project (RO II) - Ongoing
Earthworks, Sheet Piling and other Enabling systems.
Structural Concrete works
Specialized Waterproofing System
Architectural and Finishing works
2 Years
SWCC
Acciona Agua S.A & RTCC (JV)
Al-Khobar, KSA
Construction Of SWRO Desalination Plant, SWCC Al-Khobar(RO-I) - Ongoing
Scope of Work Summarized as follows:
Structural civil works for the complete plant
Concrete protection works including specialized waterproofing & painting
Procurement & erection of steel superstructure & sheeting
Pipeline works (UG/AG) for the complete plant including required valves & fittings
Installation of specialized equipment for the complete plant
Landscaping & Architectural works
1 Year
SWCC
Acciona Agua S.A
Al-Khobar, KSA
Tank Farm Maintenance Services
Scope of Work for this project includes:
Execution of Portable Water Tank Farm Maintenance
Mechanical Maintenance Services for Tanks
Surface Preparation and Painting Activities
Hydro Test Services
Chlorination and Disinfection Services
Lime Silo B Maintenance Services for Al Dur Water & Power Project, Bahrain
Inspection services and analysis of actual lime accumulation
Design and feasibility analysis of new cleaning tool
Manufacturing of new cleaning tool
Trial run reference to actual silo conditions
Stage wise cleaning services for removal of lime accumulation
Inspection services for blockages
Silo handover to operations
35 Days
Engie
Al Ezzel
Al Dur, Bahrain
Pipeline Laying And Asphalting Works For New Drainage Pipe Line In Zahrat Laban, Riyadh For National Water Company (NWC)
Trenching and Excavation works for Pipe laying
Laying of Sewer Pipes
Backfilling and Asphalt Reinstatement
1 Year
NWC (National Water Company)
Saudi Tumpane
Riyad, KSA
Lime Silo Maintenance Services for Al Dur Water & Power Project, Bahrain
Inspection services and analysis of actual lime accumulation
Design and feasibility analysis of new cleaning tool
Manufacturing of new cleaning tool
Trial run reference to actual silo conditions
Stage wise cleaning services for removal of lime accumulation
Inspection services for blockages
Silo handover to operations
35 Days
Engie
Al Ezzel
Al Dur, Bahrain
Pipeline Installation Works For NWC(National Water Company)
Piping Works for NWC (National Water Company) distribution system from SWCC desalination plant to pumping station and to waste water treatment plant, pipelines installation work is summarized as follows:
Earth Works
Piping Works, Coating (Internal & External)
Testing and Commissioning
Open cut road crossing and Reinstatement
Construction of Pits for NDRC works (Jacking Pits and Receiving)
1 Year
NWC (National Water Company)
Tecton Engineering And Construction LLC
South Dhahran Water Project, KSA
Al Khafji Solar Saline Water Reverse Osmosis Desalination Plant
The Plant is the first ever large scale solar operated Desalination Plant in the world
The desalination plant will include a dissolved air flotation unit (DAF) system, second-stage ultra-filtration unit (UF), Chemical-dosing systems, RO unit, storage tanks for CO2, chlorine and lime, and main electrical power as well as a centralized control room for power and water and a Seawater Intake Structure for the inflow of seawater through FRP Pipes
300 Days
KACST
AWT & Rawafid National Services
Al Khafji, KSA
Seawater Intake Structure, SWI Electrical Building & Marine Works For Al Jubail - SWRO Phase- II Desalination Plant
Main Scope - Civil, Marine, Architectural, HVAC Works
The massive structure is completely built with 5000 Cu’m of specialized concrete mix (Ground Granulated Blast Surface Slag – GGBFS)
Construction phase includes massive excavation of nearly 13000 Cu’m . The 11m high structure is approximately 8m below the ground level
Specialized Protective coating system is introduced (Polyurea) to prevent the leakage inside this water retaining structure